China Starts Ultra-Supercritical Coal Unit at 2,850 Metres in Golmud, Qinghai
青海格尔木:海拔2850米超超临界煤电1号机组投运
The first unit of a coal-fired plant in Golmud, Qinghai, at an average altitude of about 2,850 metres, has entered commercial operation after a 168-hour trial run — the highest-sited ultra-supercritical unit of its kind. The plant's two 660 MW units are expected to generate about 6 billion kWh a year once both are running.
Read the original(Kun.uz)↗