Jiangxi Targets More Than 5 GW of New-Type Energy Storage by 2030
江西“十五五”新能源体系规划:2030年新型储能超5 GW、新能源成第一大电源
Jiangxi province has issued its 15th Five-Year Plan (2026–2030) for a new energy system, TaiyangNews reported on November 13. The province targets total generation capacity of more than 110 GW by 2030, including over 55 GW of new energy — with an aspirational 60 GW — making new energy its largest installed source. It plans to add more than 18 GW of wind, solar and biomass during 2026–2030 while keeping the new-energy utilisation rate above 90%. By 2030, new-type storage is to exceed 5 GW, pumped storage to reach 3.3 GW, virtual power plants to provide 3 GW of regulation capacity and demand response 2.9 GW.
Editor's note Jiangxi lists new-type storage above 5 GW alongside 3.3 GW of pumped storage, 3 GW of virtual power plants and 2.9 GW of demand response — a provincial plan written as a flexibility portfolio, not single items. With new energy set to become the largest source while utilisation must stay above 90%, delivery of that portfolio is the binding constraint.
Read the original(TaiyangNews)↗